SPECIFICTIONS |
|
Product name: |
2000W customized heating element for electric oven |
Voltage: |
110-127V ,220-240V |
Power: |
1000-2000W |
Tube material: |
Stainless steel(201/304/316) |
Tube size: |
Customizable |
Terminal shape: |
Customizable |
Single packing: |
Bubble bag/PE bag or customized |
This model of heating element is installed on the electric oven for use.The heat is transferred from the heating element to air,then to the food, so that the food can be cooked.Great efficiency in transferring heat and long life time are its advantage.
Q1: What is the mainly usage of spiral heating tube?
A: This product is mainly used for electric stoves.
Q2:What is the temperature of the electric heating tube? Is it acid and alkali resistant?
A: 800 ℃ c of heat-resistant, limit the long-term use of heat-resistant up to 650 ℃, 5% concentration, salt fog test standard last 48 hours.
Q3:Whether the heating wire will come off?
A: This product adopts the welding wire with heat resistant 200 degrees high temperature, welding and riveting process at welding wire position, so as to avoid the danger of loose connection at the source.
We have several single packaging for this product, respectively bubble bag, PE bag, color box and so on. Outer packaging is paper carton with plastic woven bag.
Besides, A variety of modes of transportation are also available.
Generally speaking,We have inspectors to inspect every part of the production process.All the products are tested before the delivery to ensure the safety and reliability of electrical performance,and achieve a 100% pass rate.So you can rest assured to purchase.
Q1:What’s your MOQ?
A:Usually the MOQ of each model is 3000 pcs ,but we can accept trial order which the quantity is less than 3000pcs.
Q2:Are you factory or trading company?
A:We’re professional manufacturer of the immersion water heater,heating element and extension cord.
Q3:What certificate do you have?
A:Our factory have passed CE ,ROHS and ISO9001:2015 certificates.
Q4:How many days for mass production?
A:It usually takes 25-30 days after order confirmation.
Q5:Where is your factory located?
A:Our factory is located in Danyang City ,Jiangsu province,which is near Changzhou city.
Q6:What is your payment terms?
A:30% deposit before the production,and the balance payment can be paid before the delivery.